All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Cabling
|
Camden-Fairview Middle
|
500
|
General Cable/Cat6a runs
|
Antennas, Connectors and Related Components
|
Camden-Fairview Middle
|
20
|
Abernathy horizontal management or functional equivalent.
|
Antennas, Connectors and Related Components
|
Camden-Fairview Middle
|
500
|
Abernathy Cat6a jacks or functional equivalent.
|
Antennas, Connectors and Related Components
|
Camden-Fairview Middle
|
20
|
Abernathy patch panels or functional equivalent.
|
Antennas, Connectors and Related Components
|
Camden-Fairview Middle
|
1000
|
Abernathy patch cords or functional equivalent.
|
Antennas, Connectors and Related Components
|
Camden-Fairview Middle
|
700
|
Caddy J-hooks or functional equivalent.
|
Antennas, Connectors and Related Components
|
Camden-Fairview Middle
|
8
|
Surface mount boxes
|
Racks
|
Camden-Fairview Middle
|
3
|
Fixed open frame wall mount
|
2019C2BiddingInstructions15.docx |
C2COVERPAGE1962.pdf |
Answer:
A surface mount box is a box that is used to wire densely populated places like office cubicles.
Answer:
Question: What length do the patch cables need to be for the Cat6a drop and what color do you want the jacks to be? 3 feet length patch cords
Answer:
1) During the walk through you asked to replace existing 3 ft' racks with new 3 ft' racks. It seemed fairly congested. Would 4 ft' racks be better suited for the job? Can we confirm the racks are for sure 3 ft' currently and not 4 ft'? ​ Two of the current racks are 3 ft' and one is 4 ft'. Four foot racks will be fine.
2) Do the new racks need to be deep cabinet for future switch purchases that might require the depth?​ Yes
3) During the walk through, lockable cabinet were preferred but not mandatory. Can we confirm that this is not a state requirement where classroom cabinets should be in locked cabinets? ​ Locking cabinets are not required for classrooms.
4) I heard the cable request called CAT6 and CAT6A, can we get a confirmation of specifically which one is being requested.​ ​ ​We have requested CAT6A
5) We noticed security cameras throughout the walk through. Are those analog or IP? If they were IP were they included in the cabling counts for this project? ​ Security cameras are not part of the RFP.
Answer:
Question: Based on the IFCB, it showed 500 as the cable count. Understanding that this is an estimate, we're coming up with 408 cables on the attachment given to us at the walkthrough yesterday. However, unless I'm missing any pages from that, we came up with 408. Would like this clarified on the count so I can determine if I was missing a page or if our counts were accurate.​ There were no pages missing.