UPDATE: 1/17/19 C2 Projects C and F have been cancelled. Those projects have been posted on a new IFCB/470 #190016711. There is no mandatory walkthrough required to bid on IFCB/470 #190016711.
Internal Connections
INTERNAL CONNECTIONS ALL PROJECTS: There is another document associated with this IFCB available for download that details the equipment the applicant wishes to purchase. The document lists equipment that the applicant prefers – they will also accept functional equivalents of said items.
Internal Connections Project A
Project Narrative
Our District currently has over 750 APs on our current controller. APs must conform to our current environment. No installation is needed.
Compatibility Requirement- Project A
APs must be compatible with Aruba 7220 controller.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B. Bids for individual components of a single project will be disqualified.
Internal Connections Project B
Project Narrative
Vendor should be an authorized reseller and installer, as installation will be needed. Vendor is also responsible for disposing of old modules. Vendor must be an APC certified engineer.
Voluntary Site Visit for Project B
Vendors wishing to bid on internal connections Project B, can attend a voluntary site visit on January 4th, 2019 at 11am. Vendors will meet at Central Middle School located at 10601 E 59th St., Raytown, MO 64133.
Compatibility Requirement
UPS device must be a comparable unit to replace APC Symmetra LX 8kVA Scalable to 16kVA N+1 Rack-mount, 208/240V.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: For project B, the contractor must provide at least 3 references, otherwise their bid will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B. Bids for individual components of a single project will be disqualified.
Internal Connections Project C
Project Narrative-Project C
Vendor should be an authorized reseller and installer, as installation will be needed. Vendor is also responsible for disposing of old modules. Vendor must be an APC certified engineer.
Mandatory Site Visit for Project C
Vendors wishing to submit bids for internal connections project C must attend one of two mandatory site visits. The first site visit will be held on January 4th, at 10:00 am. The second visit will be held on January 16th, at 1:30 pm. Vendors will meet at Raytown High School located at 6019 Blue Ridge Blvd., Raytown, MO 64133. Bids from vendors who did not attend either of the site visits will be disqualified.
Compatibility Requirement
UPS device must be a comparable unit to replace Liebert Nfinity 4-20kVA unit.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: For project C, the contractor must provide at least 3 references, otherwise their bid will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified.
BASIC MAINTENANCE OF INTERNAL CONNECTIONS ALL PROJECTS: There are two other documents associated with this IFCB available for download that lists the equipment to be maintained.
Basic Maintenance Project D – see Internal Connections request for Project A.
Basic Maintenance Project E – see Internal Connections request for Project B.
Basic Maintenance Project F – see Internal Connections request for Project C.
BMIC-Project G
Project Narrative-Project G
1 year Advantage Ultra Service Plan for In-Row RC.
BMIC-Project H
Project Narrative-Project H
1 year Advantage Ultra Service Plan for Symmetra PX 40kVA
BMIC-Project I
Project Narrative-Project I
We have (2) controllers- an active and a passive. Only one device is Erate eligible. Maintenance not due until 10/2019 with a co-term through 06/2024. The District would like the option of annual vs. 5 year.
BMIC-Project J
Please see attached document labeled Switch-Router Maintenance for project details.
DISQUALIFICATION FACTOR BMIC ALL PROJECTS: Service providers are required to bid the entire hardware project. Bids for individual components of the project/upgrade will be disqualified.
DISQUALIFICATION FACTOR BMIC ALL PROJECTS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR BMIC ALL PROJECTS - Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.