All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Cabling
|
Tulsa Legacy- Lower
|
7
|
Data drops
|
Firewall Service and Components
|
Tulsa Legacy- Lower
|
1
|
Cisco Meraki or functional equivalent
|
UPS/Battery Backup
|
Tulsa Legacy- Lower
|
1
|
APC or functional equivalent
|
Wireless Access Points
|
Tulsa Legacy- Lower
|
25
|
Cisco Meraki or functional equivalent
|
Wireless Controller
|
Tulsa Legacy- Lower
|
1
|
Cisco Meraki or functional equivalent
|
Cabling
|
Tulsa Legacy- Upper
|
30
|
Data drops
|
Firewall Service and Components
|
Tulsa Legacy- Upper
|
1
|
Cisco Meraki or functional equivalent
|
Switches
|
Tulsa Legacy- Upper
|
1
|
Cisco Meraki 48-port or functional equivalent
|
2019C2BiddingInstructions5888.docx |
C2COVERPAGE37.pdf |
Answer:
* Does School have an existing wireless controller or solution in place now?
>Tulsa Legacy Lower has a Cisco 5508 WLAN Controller
>Tulsa Legacy Upper has a Cisco AIR-CT2504-K9 WLAN Controller
* Does the school need cable for lower school for the AP?
>Cabling is needed for 7 new AP locations. Cat6 cabling exists for all other APs.
* Would the school be willing to have a walkthrough for the cabling install and wireless install?
> Walkthroughs will not be given.
* Or could you provide a school plan and what type of walls and ceiling heights and type of ceiling are in place for the access points and cable installation?
>All ceilings are lay-in acoustical tile ceilings between 8-10’ tall with a maximum cabling distance of 150’. All cabling should be run to a new Cat6 patch panel in the MDF, which is centally located. Spece exists in the rack for the patch panel.
* Does school want a specific type of cable like brand anme, Cat5e,cat6, cat6a, Plenum or non-plenum, structured cabling or non-structured cabling?
>Cat6, non-plenum cable should be used
Answer:
-What form (rack mount or tower) UPS would you like?
>Rack
-Type of UPS? (Offline, Line interactive, or Double Conversion)
>Ddouble-conversion on-line
-How many watts do you need?
>2200 VA or greater
-Runtime?
>10 min or greater