All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
1. Where will the 10 8-port switches be used?
The switches are replacement switches for various locations around the building including the computer lab, offices, cafeteria, copier room, and a classroom in an out-building.
2. Where are the 8 data drops to be located?
The drops are to replace drops in various locations including the computer lab, offices, cafeteria, and classrooms.
3. What locations are we tying the fiber into?
We are tying in the secondary building which houses a rack with switches.
4. Will you be tying your out-building that houses classrooms into the fiber optics?
Not necessarily. The main need is to tie in the secondary builing that houses a rack with switches.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Switches
|
White Rock
|
10
|
Netgear or Linksys or functional equivalent
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
UPS/Battery Backup
|
White Rock
|
1
|
American Power Conversion or functional equivalent
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Antennas, Connectors and Related Components
|
White Rock
|
2
|
Media converters
|
Cabling
|
White Rock
|
250ft.
|
Fiber optics
|
Cabling
|
White Rock
|
8
|
Data drops
|
2019C2BiddingInstructions7157.docx |
C2COVERPAGE57.pdf |
Answer:
We are requesting 8 port switches. A gigabit is the speed. We are adding to an existing network. We currently have copper, but hope to put in fiber and therefore will be connecting to fiber.