All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
INTERNAL CONNECTIONS - UNIVERSITY CITY
|
|||
SCHOOL
|
Type of Equipment
|
Qty
|
Make/Manufacturer
|
Flynn Park
|
Cabling drops
|
10
|
no preference
|
Flynn Park
|
Switches
|
10
|
Dell 48 port or functional equivalent
|
Flynn Park
|
UPS/Battery backup
|
3
|
no preference
|
Flynn Park
|
WAPs
|
10
|
no preference
|
Jackson Park
|
Cabling drops
|
10
|
no preference
|
Jackson Park
|
Switches
|
10
|
Dell 48 port or functional equivalent
|
Jackson Park
|
UPS/Battery backup
|
3
|
no preference
|
Jackson Park
|
WAPs
|
10
|
no preference
|
Pershing ES
|
Cabling drops
|
10
|
no preference
|
Pershing ES
|
Switches
|
10
|
Dell 48 port or functional equivalent
|
Pershing ES
|
UPS/Battery backup
|
3
|
no preference
|
Pershing ES
|
WAPs
|
10
|
no preference
|
Barbara Jordan
|
Cabling drops
|
10
|
no preference
|
Barbara Jordan
|
Switches
|
10
|
Dell 48 port or functional equivalent
|
Barbara Jordan
|
UPS/Battery backup
|
3
|
no preference
|
Barbara Jordan
|
WAPs
|
10
|
no preference
|
Julia Goldstein
|
Cabling drops
|
10
|
no preference
|
Julia Goldstein
|
Switches
|
10
|
Dell 48 port or functional equivalent
|
Julia Goldstein
|
UPS/Battery backup
|
3
|
no preference
|
Julia Goldstein
|
WAPs
|
10
|
no preference
|
Brittany Woods
|
Cabling drops
|
15
|
no preference
|
Brittany Woods
|
WAPs
|
10
|
no preference
|
High School
|
Cabling drops
|
15
|
no preference
|
High School
|
WAPs
|
10
|
no preference
|
2019C2BiddingInstructions40.docx |
UniversityCityC2CoverPage.pdf |
Answer:
We are adding to current wireless, and we are open to other vendors that work with our current switching.
Answer:
We have ubiquity access points.
Answer:
Primarily cost and durability of product.
Answer:
The list of locations is on the RFP, and the list of locations is primarily classrooms with 30 clients per AP (on average)
Answer:
We will go with 3 switches to one UPS and 2 switches to the other. We will have space on the switches to grow into. We may have some switches with one power supply and some with dual based on cost. 110 outlets on two different circuits. Yes on remove management. 90 minute runtime. Four post. racks
Answer:
Question 1: That information is not available at this time, but we are trying to generate it. If it is available, we will post an update to the IFCB next week.
Question 2: Ubiquity Pro all POE
Question 3: That information is not available at this time, but we are trying to generate it. If it is available, we will post an update to the IFCB next week.
Question 4: We are hoping to get to 100%. We don't believe that this project will complete this, but it is a long-term goal.
Answer:
Question 1: That information is not available at this time, but we are trying to generate it. If it is available, we will post an update to the IFCB next week.
Question 2: Ubiquity Pro all POE
Question 3: That information is not available at this time, but we are trying to generate it. If it is available, we will post an update to the IFCB next week.
Question 4: We are hoping to get to 100%. We don't believe that this project will complete this, but it is a long-term goal.
Answer:
The lastest access point that we installed was: Ubiquiti Networks Unifi 802.11ac Dual-Radio PRO Access Point (UAP-AC-PRO-US) We would like this or better (of course, bids for functionally equivalent equipment will be accepted).
Answer:
Question: 1. Are you using CAT6 Plenum Cable for your AP’s?
YES
2. What is the average distance that is required for your new cabling Runs (supporting your AP’s)?
150 ft.
3. Would you like us to standardize cable run lengths as a not to exceed length of 150 or 200 Ft?
Yes, not to exceed 150 feet
4. Do you MDF’s/IDF’s have open Patch Panel ports to support your new Cables runs/AP’s?
YES
5. Do you have floor plans or heat maps for the schools receiving AP’s?
HERE ARE THE FLOOR PLANS THAT WE ARE PROVIDING FOR ALL... https://drive.google.com/open?id=0B9i4UUQbsapwN1BlczM4SGRndms
6. Is the Customer needing a Wireless Assessment to be preformed? To show best coverage and placement of AP’s for their Campuses?
NO
7. Do the switches need 1G or 10G uplinks?
1G
Do they need POE? If so, just POE or full POE+?
Yes, POE, prefer full POE+
8. Do you need stacking modules for the switches?
No, not as a part of this bid.
9. Do you want the SFP's to be 1G or 10G? Do you need multimode or singlemode?
1G multimode
10. On the RFP 50 switches and 70 WAP's are requested. But under Category 1, a qty of 25, 48 port switches and a qty of 50 SFP's are listed. Can you confirm the quantities needed?
We do have different totals based upon our Category One and Category Two needs. You should bid these separately (bid the Cat 1 switch project separately from the Cat 2 switch project). These are our maximize needs. Final quantities will be determined based on final budget availability