All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
INTERNAL CONNECTIONS: PROJECT A - SWITCHES, GBICS, TWINAX CABLES
|
|||
SCHOOL
|
Type of Equipment
|
Qty
|
Make/Manufacturer
|
High School
|
Antennas, components
|
12
|
Ubiquiti single mode fiber GBIC or functional equivalent
|
High School
|
Cabling
|
10
|
Twinax or functional equivalent
|
High School
|
Switches
|
15
|
Ubiquiti Unifi or functional equivalent
|
High School
|
Switches
|
3
|
Ubiquiti Unifi fiber or functional equivalent
|
Elem School
|
Antennas, components
|
8
|
Ubiquiti single mode fiber GBIC or functional equivalent
|
Elem School
|
Cabling
|
8
|
Twinax or functional equivalent
|
Elem School
|
Switches
|
9
|
Ubiquiti Unifi or functional equivalent
|
Elem School
|
Switches
|
2
|
Ubiquiti Unifi fiber or functional equivalent
|
|
|||
INTERNAL CONNECTIONS: PROJECT B - IN GROUND FIBER INSTALLATION AT HIGH SCHOOL
|
|||
HS
|
1 - Approx. 1,000 feet
|
|
1 single mode fiber run from the Admin building to the field house
|
HS
|
3 – approx. 300 ft., 400 ft. and 600 ft.
|
|
3 single mode fiber runs to each IDF in the HS main building
|
HS
|
1 – Approx. 900 ft.
|
|
1 single mode fiber run from the Admin to the Agri. building
|
|
|
|
All runs should terminate at the IDFs.
|
SingleModeFiberrunFromESCampustoNIF.JPG |
WestsideC2COVERPAGE.pdf |
2019C2BiddingInstructions65.docx |
Answer:
Each fiber run will need a minimum of 1 pair of strands. All strands must be terminated in the racks and tested for signal loss.
Answer:
The BMIC is for a 1 year service contract on the new switches.
BTW: A question was asked during the walkthrough whether or not there is buried conduit between the Agri building and the Fieldhouse at the HS. There is buried conduit with the current fiber in it.