All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
1. Are the UPS's requested for this project rack mountable? - No, it is not nessesary
2. Are they 2 or 4 post railkits? - 2
3. What is the minimum run time? – USAC will only fund short term UPS solutions 15 - 30 minutes is what we’re looking for.
Type of Equipment
|
Specific Quantity
|
Preferred Make/Manufacturer
|
Switches
|
5
|
Meraki Switch MS120-48-HW or functional equivalent
|
Switches
|
5
|
Meraki Switch License LIC-MS120-48P-3YR or functional equivalent
|
Switches
|
12
|
Meraki Switch MS120-24-HW or functional equivalent
|
Switches
|
12
|
Meraki Switch License LIC-MS120-24P-3YR or functional equivalent
|
Wireless Access Points
|
17
|
Aruba IAP-225-US or functional equivalent
|
UPS/Battery Backups
|
13
|
UPS Power Backup SMT1500 or functional equivalent
|
2018C2BiddingInstructions9643.docx |
C2COVERPAGEINCA.pdf |
INCAC2ListByLocation.xlsx |
Answer:
Is the AP cabling in place or is it to be included in the bid? It is in place.
Answer:
It is for multiple locations.
Answer:
1. Is Configuration and implementation desired? Yes
2. Are the devices listed in the RFP to be configured and implemented at a single location? They are to be implemented and located at various locations.
3. We are not an Aruba authorized partner - will the Meraki and UPS's be considered for selection apart from the wireless access points? Yes functional equiv. will be accepted