All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Specific Quantity
|
Make
|
Model
|
Switches
|
High School
|
7
|
SMC Networks
|
SMC 6726AL2 10/100 24 Port
|
Switches
|
High School
|
1
|
Extreme
|
Extreme Summit X450a-48T
|
Switches
|
High School
|
1
|
D-Link
|
DGS-3100-24P
|
Switches
|
High School
|
2
|
Hewlett Packard
|
V1910-24G-POE
|
Router
|
High School
|
1
|
OTC Pfsense Linux
|
OTC Pfsense Linux Router
|
Cabling
|
High School
|
174
|
Belden
|
Belden Network Drop
|
Switches
|
High School
|
4
|
KTI
|
KC-300D-T Fiber Converter
|
UPS/Battery Backup
|
High School
|
4
|
APC
|
APC Smart UPS 1500
|
Type of Equipment
|
School Name
|
Specific Quantity
|
Make
|
Model
|
Switch
|
Middle School
|
3
|
SMC Networks
|
SMC3726AL2 10/100 24 Port
|
Switch
|
Middle School
|
1
|
Hewlett Packard
|
V1910-24G-POE
|
Switch
|
Middle School
|
1
|
D-Link
|
DES1210-28P
|
Cabling
|
Middle School
|
80
|
Belden
|
Belden Network Drop
|
Wireless Access Point
|
Middle School
|
1
|
D-Link
|
DWL-3200AP
|
UPS/Battery Backup
|
Middle School
|
1
|
APC
|
APC Smart UPS 1500
|
Type of Equipment
|
School Name
|
Specific Quantity
|
Make
|
Model
|
Switch
|
Elementary
|
3
|
SMC Networks
|
SMC3726AL2 10/100 24 Port
|
Switch
|
Elementary
|
1
|
Hewlett Packard
|
V1910-24G-POE
|
Switch
|
Elementary
|
1
|
D-Link
|
DES1210-28P
|
Cabling
|
Elementary
|
80
|
Belden
|
Belden Network Drop
|
Wireless Access Points
|
Elementary
|
2
|
D-Link
|
DWL-3200AP
|
UPS/Battery Backup
|
Elementary
|
1
|
APC
|
APC Smart UPS 1500
|
2018C2BiddingInstructions16.docx |
HealdtonC2COVERPAGE87.pdf |
Answer:
We are only requesting bidders to manage and maintain existing drops.
Answer:
You can bid the WAN without the Internet (or vice versa) but we do require that you be approved to provide OUSF credits by the Oklahoma Corporation Commission at the time you submit your bid in order to be considered.
Answer:
Repair, upkeep and maintenance of the cabling drops to keep each drop working correctly.