UPDATE 3/23: The prevailing wage order has been attached.
UPDATE: 3/20/2017: An additional walkthrough date has been added for vendors that were not able to attend either of the first two. The new date and time are below:
March 30th at 10:00am
St. Clair High School
1015 High School Dr
Project A
Self-Provisioned Fiber Connections – 4 connections. There is a zip file available for download with more information – Fiber Specs.
Winning bidder will need to provide the following:
The route mapped in either a .kmz or .json file.
Aerial portion of fiber build:
1. What is the average cost of the fiber material per foot? (E.g. cost of actual fiber cables.)
2. What is the average cost of the Fiber placement per foot?
3. What is the average cost of the structure material per foot? (e.g. cost of conduit, splicing, make ready pole attachment, etc.)
4. What is the average cost of the structure placement per foot?
Buried with Conduit (underground)
1. What is the average cost of the fiber material per foot? (E.g. cost of actual fiber cables.)
2. What is the average cost of the Fiber placement per foot?
3. What is the average cost of the structure material per foot? (e.g. cost of conduit, splicing, make ready pole attachment, etc.)
4. What is the average cost of the structure placement per foot?
MANDATORY SITE VISIT:
Vendors wishing to submit bids for self-provisioned fiber project must attend one of two mandatory site visits. The first one is March 21, 2017 and the second one is March 23, 2017. Both meetings will be at 10:00am and start at the HS Office, 1015 High School Drive, St. Clair, MO 63077. Bids from vendors who did not attend one of the mandatory meetings will be disqualified.
Project B
Leased Wide Area Network Circuits – 4 x 10 GB - 40 GB connections any delivery type. There is a zip file available for download with more information – Fiber Specs. Dark fiber bidders should bid 4 strands of fiber. Lit leased fiber bidders should bid 10 Gbps - 40 Gbps.
Project C
The District is requesting switches for the C1 fiber projects (self-provisioned or any leased fiber solution). If you are bidding lit fiber, please include the lease cost for those switches. Current equipment at each end is HP J8698A chassis with a J8706A Fiber Module. The current replacement model of this chassis is J9822A with a J9537A fiber module. We will accept bids for functionally equivalent equipment.
Project D
Operations and Maintenance - There is a zip file available for download with more information – Maintenance Specs.