All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
2017C2BiddingInstructions56.pdf |
SantaFeC2COVERPAGE.pdf |
SantaFeC2attachment.xlsx |
Answer:
1. Do you need Dual Supervisors?
Each router will house dual management cards as indicated by the equipment list.
2. What Network Modules do they need to support on the access switches? How will they connect them to the Core?
The equipment list indicates the gbics required which will be fiber connected.
3. What Layer 3 support do they need on the switches or do we just need Layer 2 support?
The switches required must be the model listed or an equivalent.
4. Are you open to a stacked switch solution?
The equipment list indicates stacking modules.
Answer:
We are not conducting site visits. We have listed all equipment needed and there will be no cabling required.
Answer:
Please make sure you are reading all of the bidding documents.
Do the switches need to be PoE?
Yes, as indicated by particular model # (refer to IFCB and attachments)
Do they all need to be 48 ports?
IFCB indicates the port counts by model #. (refer to IFCB and attachments)
Do the routers need to take a full internet table?
No
Do the routers need to even run BGP at all (our switches run all dynamic routing protocols so if a full table is not required I might have a different solution)?
No
Do you require optics?
Yes
---If so, how many and of what lengths (sr/lr/er/zr/etc.)
Specified on IFCB. (refer to IFCB and attachments)
Answer:
Please make sure you are reading all of the requirements listed on the IFCB.
· Will submissions with refurbished gear be accepted? DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
· Does the vendor need to be an authorized reseller. No
· Will you accept partial submissions? DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade. Bids for individual components of the project/upgrade will be disqualified.
· Will you accept equivalent solutions? The document lists equipment that the applicant prefers – they will also accept functional equivalents of said items.
· Would it be possible to quote only the equipment and not the install? DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade. Bids for individual components of the project/upgrade will be disqualified.
Answer:
Please make sure you are reading all of the bidding material. All of these questions are answered in the original bidding documents. As it is stated on the 470 and IFCB all bids must be submitted via the online bidding system.
Answer:
1. Is a walkthrough of the installation sites required? No
2. How many locations require installation? 5, but we will do our own installs.
3. Please provide the addresses of each location. Not applicable
4. Can you provide a floor plan of each location that illustrates where installations are required? Not applicable
5. How many devices are to be installed into each location? Please refer to RFP, as the quantities are listed.
6. Will these devices be freshly installed or is this a rip and replace request? Rip and replace
7. If this is a fresh install, do you have all necessary cable drops? Not applicable
8. If this is a rip and replace, do you require recycling services? No
9. Is installation able to be done during the day or after hours? Installation may be done during the day, but changeover of service will be done after hours.
Answer:
we are not requesting cabling, patch panels or wireless access points as part of our 470/RFP.