All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Answer:
A simple IP routed network will work.
Answer:
If you’re bidding the three 1 Gb leased lit WAN connections we do want you to bid all of them. Otherwise you can bid individual projects.
Answer:
1.) We are looking for one line with basic service, and two lines with smartphone service. 2.) We currently have have 2 Samsung Galaxy phones and 1 very old flip phone. 3.) Unlimited minutes for each line. 4.) Unlimited data and text on both smartphones. 5.) The primary purpose of the phones is employees to communicate with other district employees for work purposes.
Answer:
939 Tiger Ln is our logical hub (this is the location all traffic comes to go outside the district) although the three circuits are to be connected in a loop configuration for resiliency. There should be a circuit between 939 Tiger Ln and 2372 Championship Dr. a circuit between 2372 Championship Dr.. and 1741 Hwy 90, and a circuit between 1741 Hwy 90 and 939 Tiger Ln.
Each location will have two open SFP ports rated at 1.0Gbps.
2372 Championship (high school) has a Cisco 4507 (SFP blade)
1741 Hwy 90 (Elementary) has a Cisco 3750g (SFP)
939 Tiger Ln (Admin, Intermediate, and Junior High) has a Cisco 3750g (SFP)
Answer:
Yes, 939 West is 939 Tiger Lane. Nothing has changed, we are still in need of the exact same services that you are currently providing. 1315 Kloecker is the same as 2372 Championship Dr. (the 1315 address was the original address before the campus actually opened and the Championship Dr. road was completed). And continue with Leased Lit Fiber service-3x1GB bandwidth. And yes terminating addresses for those circuits are 939 Tiger Lane (West), Sealy, TX 77474; 1741 Hwy 90W., Sealy, TX 77474; 2372 Championship Dr. (1315 Kloecker), Sealy, TX 77474.