All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
SouthernBooneC2list.xlsx |
InternalConnectionsTemplateV15133.xlsm |
ManagedInternalBroadbandServicesTemplateV15141.xlsm |
Answer:
No, you need to bid the entire Project A in order to submit a complete bid.
Answer:
Q: Are the Ethernet drops add on or do they require new raceway?
A: The cabling for the drops is installed through the ceiling and down the wall. No new raceway will be needed.
Q: Will the POE switches only accommodate the new equipment or other equipment?
A: Only new equipment.
Q: Will the new Ethernet drops be replacing old ones?
A: Yes. New drops will replace old wiring. Old wiring will need to be removed.
Q: Will we be using existing patch panel space?
A: Yes.
Q: Where will the 35 drops be placed in the library?
A: On the south wall there will be three drops with three ports. On the west wall there will be two drops with four ports each. On the north wall there will be three drops with four ports each. One drop with four ports will be in the center of the library located in the check-out area. The last Ethernet drop will be placed on the south side of the library in an office area with two ports.
Q: What are you going to do with the switches in the library located on the north wall?
A: The two switches will be moved to the central switch room in the north building.
Q: Will you want electrical metallic tubing (emt) or plastic surface raceway installed in the library?
A: Plastic surface raceway.
Q: Is there a preference on manufacturer for the patch panel in the band room?
A: No, as long as it is Cat 6 compatible.
Q: Is the patch panel cabling in the band room Cat 6?
A: No. New cabling installed should be Cat 6.
Q: Can we bid the cabling but not the network switches and the wireless access points?
A: No. This is a single project.
Answer:
No, the district does not own licensing for the 8 additional access points.
Answer:
Yes it has been filed. It's the same number as this IFCB, 160004338