All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
InternalConnectionsTemplateV15178.xlsm |
ExhibitA.pdf |
HSISFiber.pdf |
IS_Equipment.pdf |
Answer:
All new fiber optic cabling must be installed in brand new trenched or bored underground-rated conduit. No existing conduit may be used for this project. There is a clear physical path between the buildings, but there may be buried cabling, pipes, or other conduit that would need to be located and avoided.
Answer:
No
Answer:
1. What type of fiber will be installed on the cable runs? 12 strand multi-mode fiber
2. If a rack is installed do we need to provide power? No.
3. What model of HP switches are preferred for the project? Switches must be Layer 3. Examples include 5406, 54312, 5500, 5130, and 2920.
Answer:
You will be submitting the bid electronically (you will click on the “submit a bid button” on the IFCB) and be sure to follow all requirements listed. The contact person on the 470 is Chris Webber. The deadline is midnight pacific time. We suggest you do no wait until the last day. Once you have place a bid you can log into your account and verify that your bid was uploaded and is displaying correctly (click on “my submitted bids”). By placing a bid, you agree to provide the discount method (SPI or BEAR) via the E-rate program that the applicant wants.